Ming Yang’s turbines to power 500-MW Amunet II wind farm in Egypt

Chinese wind turbine maker Ming Yang Smart Energy Group Ltd (SHA:601615) will deliver its technology for the 500-MW Amunet II wind farm to be built by UAE-based renewables group AMEA Power in Egypt.
Ming Yang’s MySE11-210 turbines have been selected for the USD-650-million (EUR-591.2m) project, which has just entered construction and is due to go online in September 2028, AMEA Power said separately.
The order marks Ming Yang’s official entry into the Egyptian wind power market. In addition to supplying the 45 turbines for Amunet II, the Chinese manufacturer will also deliver technical services for the new plant under a 25-year operation and maintenance (O&M) contract.
Amunet II will be installed about 15 km (9.3 miles) west of Ras Shukeir in Egypt’s Red Sea Governorate and is expected to produce more than 2.3 billion kWh of electricity annually. Its output will be equal to the electricity consumption of over 500,000 homes and will help offset 940,000 tonnes of carbon dioxide emissions per year.
AMEA Power is developing the project under an independent power producer model. Power Construction Corporation of China (PowerChina) was earlier this week selected as the engineering, procurement and construction (EPC) contractor.
Amunet II will add to AMEA Power’s majority-owned 500-MW Amunet I wind farm in Ras Ghareb, which was commissioned in the summer of 2025, and will expand its portfolio of wind and solar assets in Egypt to 2,500 MW.
More information:https://renewablesnow.com/news/ming-yangs-turbines-to-power-500-mw-amunet-ii-wind-farm-in-egypt-1305375/
